4/17/2023 0 Comments Marcopolo engineering spa![]() The first phase of the extension: 2013-2017 This year saw the completion of the Phase 1 of the expansion of the airport terminal. In 2016, Marco Polo Airport completed the Water Terminal (a new 5,000 sqm terminal linking passengers to the docks) an elevated moving walkway a trigeneration power plant and barracks for the local fire brigade. The reconfiguration of Marco Polo is based on an €800 million development plan that runs from 20122021, aimed at radically reshaping the airport to accommodate increased traffic, without compromising on safety and efficiency. This gateway is the third such intercontinetal hub in the country as it includes connections to North America and the Middle East. Marco Polo Airport is an important part of northern Italy’s transport infrastructure, with a growing number of passengers using routes through it thanks to an overarching traffic strategy. Marco Polo Airport: a new international hub The extension is defined by a new 280-metre-long plaza featuring a dramatic gridshell roof that allows sunlight to filter down to the passengers below. Working alongside SAVE Engineering, One Works – a global design and consultancy firm with a specialism in transport architecture and engineering – has overseen the complex architectural and structural challenges involved in bringing the airport up to 21st century standards. One Works has completed Phase 1 of a major development plan for Marco Polo Airport, with expansive new facilities carefully integrated into the existing fabric of the airport. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |